Hot Weather Concreting: Planning A Summer Pour In Geelong

Summer is when a lot of Geelong concrete gets poured. Paths, shed slabs, driveway extensions and patio bases all tend to land on the calendar once the rain eases. The same weather that makes it pleasant to work outside can be hard on fresh concrete, though. A hot northerly on a dry afternoon can pull moisture out of a slab faster than it can cope with, and the result is a surface that cracks before anyone has packed up the tools.
This guide to hot weather concreting is for homeowners planning their own small pour and for trades organising a summer job. It covers what hot weather actually does to concrete, the precautions industry guidance recommends, and what to have on hand before the truck arrives.
What hot weather does to fresh concrete
Cement Concrete and Aggregates Australia (CCAA) defines hot weather as any combination of high air temperature, low relative humidity and high wind speed. It is the combination that matters. A mild day with a strong dry wind can be harder on a slab than a still, humid scorcher.
The main risk is plastic shrinkage cracking. CCAA explains that it occurs when moisture evaporates from the surface faster than bleed water rises to replace it. The surface dries, shrinks and tears while the concrete underneath is still soft. These cracks are often short and scattered, and they can appear within hours of finishing.
Heat also speeds up setting. That shortens your working time for placing, screeding and finishing, which is why a crew that is comfortable on a cool morning can find itself rushing on a hot afternoon.
When to start taking precautions
CCAA’s hot weather datasheet says that when the air temperature rises above 30°C, precautions are usually recommended, particularly if there is also a hot dry wind. Its separate guidance on plastic shrinkage cracking recommends taking precautions once the expected evaporation rate is likely to exceed 0.5 kg/m² per hour, with cracking most likely above 1 kg/m² per hour.
There is also a limit on the concrete itself. AS 1379 requires concrete to be between 5°C and 35°C at the point of delivery, so very hot conditions can affect the supply side too. Talk to your premixed concrete supplier early if the forecast looks extreme.
CCAA also notes that the first option to consider in hot, adverse conditions is whether to postpone the pour. Moving a small job by a day costs far less than breaking out a cracked slab.
A summer pour checklist
The day before
- Check the forecast for temperature, wind and humidity, not just the top temperature.
- Plan to pour in the cooler part of the day, such as early morning, as CCAA recommends.
- Make sure you have enough people and equipment to place and finish quickly.
- Have your curing method ready to go, whether that is plastic sheeting, wet hessian or a curing compound.
- Confirm the reinforcing mesh for your slab is on site and matches what the job specifies.
On the morning
- Dampen the subgrade and formwork, then remove any standing water before the concrete goes in.
- Set up windbreaks or shade where you can. Builder’s film on timber stakes is an inexpensive windbreak.
- Keep tools and anything that touches the concrete cool and out of the sun.
During placing and finishing
- Place, screed and finish without delays between each step.
- In severe conditions, an evaporation retarder can be applied after screeding while bleed water is still present. CCAA notes these products are not curing compounds.
- Do not finish while bleed water is still sitting on the surface.
- Cut control joints as soon as the concrete allows.
Resist the urge to add water
When concrete starts stiffening on a hot day, the instinct is to add water to make it easier to work. CCAA advises that water should not be added to premixed concrete on site unless it is within the allowance for the specified water to cement ratio and slump. Extra water reduces strength and increases permeability, which can affect durability for the life of the slab. If workability is a worry, discuss the mix with your supplier before the pour day rather than fixing it with a hose.
Curing is where summer slabs are won or lost
CCAA says curing should start immediately after finishing, and that all surfaces need to be kept continuously moist. It describes the first day after placement as particularly important, especially in hot or windy weather. Common methods include:
- Covering the slab with plastic sheeting, weighted at the edges
- Wet hessian or cotton mats, kept damp
- A fine continuous mist spray
- A sprayed curing compound applied promptly after finishing
Pick a method you can keep up. Hessian that dries out by lunchtime does very little, and plastic that blows off overnight leaves the slab exposed. Follow the curing period specified for your job, and if you are using a curing compound, check whether it suits any coating or sealer you plan to apply later.
Thinking ahead to sealing
Many outdoor slabs are sealed once they have cured, especially driveways, paths and entertaining areas. The timing and product depend on the sealer type and the manufacturer’s instructions. Our guide to penetrating and topical concrete sealers explains the difference, and you can browse our concrete sealer range when you are ready. If you are still choosing reinforcement, our article on SL72, SL82 and trench mesh sets out how the common sizes differ.
This article is general information only. For anything structural, follow your engineer’s or designer’s specification.
Frequently asked questions
Is it better to pour concrete in the morning or the afternoon in summer?
Industry guidance favours the cooler part of the day, such as early morning. That gives you more working time and less evaporation while you finish.
Can I fix small surface cracks that appear on a hot day?
Some fine surface cracks are cosmetic, while others may need attention. Have someone experienced look at them, and focus on better curing and evaporation control on your next pour.
Does a curing compound replace keeping the slab wet?
It is one of the accepted curing methods, alongside wet coverings, plastic sheeting and misting. Apply it promptly after finishing and follow the manufacturer’s directions.
Is an evaporation retarder the same as a curing compound?
No. CCAA is clear that aliphatic alcohol evaporation retarders are finishing aids and should not be used as a substitute for curing.
Should I cancel a pour if a hot northerly is forecast?
Postponing is the first option CCAA suggests in adverse conditions. If you go ahead, plan an early start, windbreaks, extra hands and a curing method that is ready to use.